[Integrations](https://spiral.ai/integrations) › [Zapier](https://spiral.ai/integrations/zapier) › [New Orleans permit details](https://spiral.ai/integrations/zapier/new-orleans-permit-details)

# How to Use New Orleans permit details in Zapier

Returns one New Orleans permit with every published column, including work description, zoning, fees, and workflow information. Use it when you have a permit number and need the full record behind a search result.

|  |  |
| --- | --- |
| Model | New Orleans permit details |
| Available through | Alexandria |
| Category | Listings |
| Price | $0.00873 per call. |
| Returns | json |
| Runs | In the background |
| Setup | About 2 minutes, no API key |

## Prompts to try with New Orleans permit details in Zapier

- Each morning, take the permit numbers previously found at 1 Canal St and use New Orleans permit details to report changes in their published statuses and workflow information.
- Every Monday at 9am: use New Orleans permit details to look this up and give me the result as a table.
- Pull the latest numbers from New Orleans permit details and tell me what changed since last week.
- Check New Orleans permit details and summarize what you find in three bullet points.
- Pull the newest data from New Orleans permit details and give me the result as a table.

## How to set up New Orleans permit details in Zapier

Pick the way that suits you. Each takes about two minutes.

### Use the Spiral skill

1. **Send Zapier this message**: Your agent reads Spiral's skill and sets itself up.

```
set up https://spiral.ai/SKILL.md
```

2. **Sign in or paste a key**: Approve Spiral in the browser, or give the agent a key from the console.

### Use Spiral's MCP server

1. **Add an MCP Client connection**: In Zapier open Apps, click Add connection and search for MCP Client. Fill in the form:

```text
https://api.spiral.ai/mcp
```

2. **Sign in to Spiral and approve**: Spiral opens: sign in, pick the organization and click Authorize. No API key. Spiral gives the connection its own key; Zapier never sees it, and you can remove it under Settings › Connected apps in the console.

3. **Run a Spiral tool in a Zap**: Add an MCP Client step to a Zap and choose the Run Tool action with your Spiral connection. Pick a tool: `discover` finds the right model for a task, `estimate_cost` prices it and `run` runs it. For example, `run` with:

```json
{
  "provider": "fal",
  "model": "fal-ai/flux/schnell",
  "input": { "prompt": "a lighthouse at dawn" },
  "wait": true
}
```

4. **Run New Orleans permit details in a workflow step**: Give the step an instruction like the ones below and run it on your trigger or schedule. Spiral finds New Orleans permit details, prices it and runs it each time the step fires.

### Use the Spiral CLI

1. **Install and sign in**: Installs the Spiral CLI, signs you in and adds its skill to your coding agents.

```bash
npx -y spiral-cli@latest init
```

### Call the Spiral API

1. **Create an API key**: In the console, under API keys.

2. **Run New Orleans permit details**: One request; the result comes back by polling or a webhook.

```bash
curl https://api.spiral.ai/v1/runs \
  -H "Authorization: Bearer $SPIRAL_API_KEY" \
  -H "Content-Type: application/json" \
  -H "Idempotency-Key: $(uuidgen)" \
  -d '{
    "provider": "alexandria",
    "model": "data-nola-gov/building-permits/get_permit",
    "input": {
      "permit_number": "<permit_number>"
    }
  }'
```

Then paste one of the prompts above: Zapier finds New Orleans permit details on Spiral, shows the price and runs it.

Setup guide in the docs: https://spiral.ai/docs/quickstarts/zapier

## New Orleans permit details tools and prices

- [City of New Orleans Permits and Code Enforcement (data.nola.gov) · Get permit](https://spiral.ai/tools/alexandria/data-nola-gov/building-permits/get_permit) (Alexandria): $0.00873 per call.

## What can you do with New Orleans permit details in Zapier?

Produce a daily New Orleans permit brief and recurring comparisons of contractor activity. A scheduled agent can review the nightly refreshed records and surface changes in public building projects or construction trades.

### Prepare a contractor shortlist

Rank contractors working on New Orleans commercial construction, review their matching projects, and inspect full permit records for relevant work descriptions and outcomes.

### Research construction supply demand

Compare contractor activity for HVAC, solar, or new construction, find the projects behind the totals, and examine permit descriptions to understand the work being permitted.

### Write a local construction report

Identify recent commercial permits, compare contractor rankings, and use full records to explain notable projects with their recorded statuses and construction values.

### Study demolition activity

Compare contractors appearing on demolition permits, review the associated projects, and inspect full records to distinguish permit outcomes before describing redevelopment activity.

### Compare construction trades

Compare permit activity and recorded construction values across trades, then review individual projects to explain differences in the work represented by each total.

### Review a public building's permit history

Find permits associated with a public building and inspect their complete records for work descriptions, application dates, outcomes, and zoning recorded at application.

## Overview

- [Alexandria](https://spiral.ai/providers/alexandria)
- [All Zapier guides](https://spiral.ai/integrations/zapier)

## New Orleans permit details in other agents

- [Amp](https://spiral.ai/integrations/amp/new-orleans-permit-details)
- [ChatGPT](https://spiral.ai/integrations/chatgpt/new-orleans-permit-details)
- [Claude](https://spiral.ai/integrations/claude-desktop/new-orleans-permit-details)
- [Claude Code](https://spiral.ai/integrations/claude-code/new-orleans-permit-details)
- [Cline](https://spiral.ai/integrations/cline/new-orleans-permit-details)
- [Codex](https://spiral.ai/integrations/codex/new-orleans-permit-details)
- [Cursor](https://spiral.ai/integrations/cursor/new-orleans-permit-details)
- [Devin](https://spiral.ai/integrations/devin/new-orleans-permit-details)
- [dots](https://spiral.ai/integrations/dots/new-orleans-permit-details)
- [Factory Droid](https://spiral.ai/integrations/factory-droid/new-orleans-permit-details)
- [Gemini](https://spiral.ai/integrations/gemini/new-orleans-permit-details)
- [Gemini CLI](https://spiral.ai/integrations/gemini-cli/new-orleans-permit-details)
- [Google Antigravity](https://spiral.ai/integrations/antigravity/new-orleans-permit-details)
- [goose](https://spiral.ai/integrations/goose/new-orleans-permit-details)
- [Grok](https://spiral.ai/integrations/grok/new-orleans-permit-details)
- [Grok Build](https://spiral.ai/integrations/grok-build/new-orleans-permit-details)
- [Hermes](https://spiral.ai/integrations/hermes/new-orleans-permit-details)
- [Instinct](https://spiral.ai/integrations/instinct/new-orleans-permit-details)
- [Manus](https://spiral.ai/integrations/manus/new-orleans-permit-details)
- [Muse](https://spiral.ai/integrations/muse/new-orleans-permit-details)
- [Muse Code](https://spiral.ai/integrations/muse-code/new-orleans-permit-details)
- [n8n](https://spiral.ai/integrations/n8n/new-orleans-permit-details)
- [Notion](https://spiral.ai/integrations/notion/new-orleans-permit-details)
- [OpenClaw](https://spiral.ai/integrations/openclaw/new-orleans-permit-details)
- [opencode](https://spiral.ai/integrations/opencode/new-orleans-permit-details)
- [Perplexity](https://spiral.ai/integrations/perplexity/new-orleans-permit-details)
- [Raycast](https://spiral.ai/integrations/raycast/new-orleans-permit-details)
- [VS Code](https://spiral.ai/integrations/vscode/new-orleans-permit-details)
- [Windsurf](https://spiral.ai/integrations/windsurf/new-orleans-permit-details)

## More Zapier guides

- [New Orleans contractor activity](https://spiral.ai/integrations/zapier/new-orleans-contractor-activity)
- [New Orleans permit search](https://spiral.ai/integrations/zapier/new-orleans-permit-search)
- [New Orleans code enforcement case search](https://spiral.ai/integrations/zapier/new-orleans-code-enforcement-case-search)
- [OpenAddresses address points](https://spiral.ai/integrations/zapier/openaddresses-address-points)
- [New Orleans code enforcement case details](https://spiral.ai/integrations/zapier/new-orleans-code-enforcement-case-details)
- [OpenAddresses address record](https://spiral.ai/integrations/zapier/openaddresses-address-record)

## Questions about New Orleans permit details in Zapier

**Can Zapier use New Orleans permit details?**

Yes. Add Spiral to Zapier as an MCP server, and Zapier can find and run New Orleans permit details like any built-in tool.

**How much does New Orleans permit details cost in Zapier?**

$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Zapier plan is separate.

**Do I need an Alexandria account to use New Orleans permit details in Zapier?**

No. Spiral runs New Orleans permit details on its own Alexandria account. You sign in to Spiral once and never paste a key.

**How long does it take to set up New Orleans permit details in Zapier?**

About two minutes: add an MCP Client connection, then sign in to Spiral and approve, then run a Spiral tool in a Zap.

**Does Zapier wait while New Orleans permit details runs?**

New Orleans permit details runs in the background. Zapier starts the run, checks on it and gives you the json when it's ready.

**What geographic area does the permit data cover?**

The source is the City of New Orleans Permits dataset. Its stated coverage is New Orleans, so it should not be treated as a permit register for the entire metropolitan area.

**How far back do the records go?**

The city states that permit coverage begins January 1, 2012. That is the documented history boundary for research using this dataset.

**How fresh is the permit data?**

The city documents nightly updates. These records support daily monitoring, but the published schedule does not promise immediate visibility of changes made during the day.

**Does a closed permit mean construction was completed?**

The city counts finaled, voided, withdrawn, and denied permits as closed. Check the actual outcome before counting a closed record as completed construction.

**Does the zoning information describe current zoning?**

The city defines the zoning column as the property's zoning when the permit application was filed. An older permit can therefore describe an earlier zoning designation.

