# Canada Energy Regulator (CER) open data · Energy future

Get industry and reference data with Canada Energy Regulator (CER) open data · Energy future from Alexandria through one Spiral API key. Questions like "CER 2026 projection of Alberta in situ bitumen output in 2035", "Brent price assumption in the Canada Net-zero scenario", "electricity generation by fuel in Ontario to 2050". It runs in the background and returns structured JSON. Pay as you go, with no subscription.

- Provider: Alexandria
- Category: Industry Data
- Runs: In the background
- Returns: json
- Tool id: `alexandria` / `cer-rec-gc-ca/energy-data/energy_future`
- Page: https://spiral.ai/tools/alexandria/cer-rec-gc-ca/energy-data/energy_future

## Pricing

$0.00873 per call.

## Limits

- Longest queue wait: 1 hour
- Run deadline: 5 minutes
- Longest run, end to end: 225 minutes
- Largest inline input: 1 MB
- Largest input file: 2 GB
- Largest output: 5 GB

## Input

| Field | Kind | Allowed | Default | Description |
| --- | --- | --- | --- | --- |
| `dataset` (required) | one of | benchmark_prices, butane, crude_oil_production, electricity_capacity, electricity_capacity_technology, electricity_generation, electricity_generation_technology, electricity_interchange, end_use_demand, end_use_prices, ethane, greenhouse_gas_emissions, hydrogen_production, macro_indicators, natural_gas_drilling, natural_gas_production, pentanes_plus, primary_demand, propane | — | Dataset (2021 lacks the two technology views and greenhouse gas emissions). |
| `limit` | number | 1 to 1000 | 200 | Rows per page. |
| `offset` | number | 0 to … | 0 | `next_offset` from the previous page; repeat the other inputs with it. |
| `region` | text |  | — | Province, territory or `Canada`. |
| `edition` | number | 2016 to 2100 | 2026 | Energy Future edition: 2026 (default), 2023 or 2021. |
| `year_to` | number | 1990 to 2100 | — | year_to |
| `category` | text |  | — | Sector (`Residential`, `Transportation`) or type (`Primary Fuel`, `Supply`). |
| `scenario` | text |  | — | Scenario name or part of it (`Canada Net-zero`, `Current Measures`, `Global Net-zero`). |
| `variable` | text |  | — | Variable or part of it (`Brent`, `In Situ Bitumen`, `Electricity`). |
| `year_from` | number | 1990 to 2100 | — | year_from |

## Example

```bash
curl https://api.spiral.ai/v1/runs \
  -H "Authorization: Bearer $SPIRAL_API_KEY" \
  -H "Content-Type: application/json" \
  -H "Idempotency-Key: $(uuidgen)" \
  -d '{
    "provider": "alexandria",
    "model": "cer-rec-gc-ca/energy-data/energy_future",
    "input": {
      "dataset": "benchmark_prices"
    }
  }'
```

Try it in the Playground: https://spiral.ai/start?provider=alexandria&model=cer-rec-gc-ca%2Fenergy-data%2Fenergy_future

## Common questions

### Canada Energy Regulator (CER) open data · Energy future

**How much does Canada Energy Regulator (CER) open data · Energy future cost?**

$0.00873 per call. You pay as you go from one Spiral balance, with no subscription, and a failed run is not charged.

**How do I use Canada Energy Regulator (CER) open data · Energy future through an API?**

Send `POST /v1/runs` with `"provider": "alexandria"`, `"model": "cer-rec-gc-ca/energy-data/energy_future"` and the input fields on this page, using one Spiral API key. It runs in the background: poll the run, or name a webhook to be told when it finishes.

**Do I need an account with Alexandria to use Canada Energy Regulator (CER) open data · Energy future?**

No. Spiral runs it on its own Alexandria account and charges your Spiral balance.

**Can my AI agent use Canada Energy Regulator (CER) open data · Energy future?**

Yes. Agents find and run it through Spiral's MCP server, CLI or agent skill, with the same API key.

