How to Use AUC featured projects in Cursor
Returns the projects and applications the AUC selects for its featured listing. Use it to discover projects with public summaries before opening an individual project's details.
Prompts to try with AUC featured projects in Cursor
Copy an example into Cursor, or ask in your own words.
Use AUC featured projects to look this up and give me the result as a table. Save the result in ./assets.
Pull the latest numbers from AUC featured projects and tell me what changed since last week.
Check AUC featured projects and summarize what you find in three bullet points.
Pull the newest data from AUC featured projects and give me the result as a table.
Check AUC featured projects every morning and tell me only when something changed.
How to set up AUC featured projects in Cursor
Pick the way that suits you. Each takes about two minutes.
Use Spiral's MCP server
- Add the hosted server
Use Add to Cursor on the console's Agents & MCP page, or add this to .cursor/mcp.json (one project) or ~/.cursor/mcp.json (every project):
{ "mcpServers": { "spiral": { "url": "https://api.spiral.ai/mcp" } } } - Sign in
Open Cursor Settings › MCP, click Connect next to spiral, sign in to Spiral and click Authorize. No API key. Spiral then shows as connected, with its tools listed.
Use the Spiral skill
- Send Cursor this message
Your agent reads Spiral's skill and sets itself up.
set up https://spiral.ai/SKILL.md
- Sign in or paste a key
Approve Spiral in the browser, or give the agent a key from the console.
Use the Spiral CLI
- Install and sign in
Installs the Spiral CLI, signs you in and adds its skill to your coding agents.
npx -y spiral-cli@latest init
Call the Spiral API
- Create an API key
In the console, under API keys.
- Run AUC featured projects
One request; the result comes back by polling or a webhook.
curl https://api.spiral.ai/v1/runs \ -H "Authorization: Bearer $SPIRAL_API_KEY" \ -H "Content-Type: application/json" \ -H "Idempotency-Key: $(uuidgen)" \ -d '{ "provider": "alexandria", "model": "auc-ab-ca/regulatory-decision/list_featured_applications", "input": { "page": 1 } }'
Then paste one of the prompts above: Cursor finds AUC featured projects on Spiral, shows the price and runs it.
AUC featured projects providers and prices
Spiral runs AUC featured projects through Alexandria. Open a card for today's price, with every fee included.
Settings you can ask for
Ask Cursor for any of these in your prompt.
| Setting | Allowed values | Default | Description |
|---|---|---|---|
| Page | 1 to 100 | 1 | page |
| Per page | 1 to 100 | 100 | per_page |
Every API field of Alberta Utilities Commission · List featured applications is on its tool page: open its card above.
What can you do with AUC featured projects in Cursor?
Build an Alberta utility proceeding view in your project. Use the AUC's public record to add regulatory context and link each summary to its source.
Build a project timeline
Research the Collisard Power Station Project from its public overview through active applications, issued documents, and hearing entries. Connect the available milestones by proceeding number and explain what each document establishes.
Prepare a municipal development briefing
Assemble an AUC briefing on proposed energy facilities around Red Deer County. Use featured summaries to explain projects, active applications to identify ongoing reviews, and documents and calendar entries to establish regulatory milestones.
Compare featured energy proposals
Compare the projects selected for the AUC's featured listing. Read their overviews, check related active applications and issued documents, and identify any published hearings before explaining differences in their regulatory progress.
Produce an Alberta energy news briefing
Prepare a public-interest briefing that connects featured project announcements, applications under review, newly issued regulatory documents, and scheduled hearings. Read the underlying notices and decisions before describing outcomes.
Review an applicant's active matters
Check which AltaLink applications are under AUC review and research their project context. Add featured summaries where available without treating the featured listing as a complete inventory.
More on AUC featured projects and Cursor
Overview
AUC featured projects in other agents
Questions about AUC featured projects in Cursor
Can Cursor use AUC featured projects?
Yes. Add Spiral to Cursor as an MCP server, and Cursor can find and run AUC featured projects like any built-in tool.
How much does AUC featured projects cost in Cursor?
$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Cursor plan is separate.
Do I need an Alexandria account to use AUC featured projects in Cursor?
No. Spiral runs AUC featured projects on its own Alexandria account. You sign in to Spiral once and never paste a key.
How long does it take to set up AUC featured projects in Cursor?
About two minutes: add the hosted server, then sign in.
Does Cursor wait while AUC featured projects runs?
AUC featured projects runs in the background. Cursor starts the run, checks on it and gives you the json when it's ready.
What geographic and utility coverage does the AUC provide?
The AUC covers Alberta's utility regulatory matters. Its jurisdiction includes investor-owned electric, gas, and water utilities and certain municipally owned electric utilities.
Is the public website the complete regulatory record?
No. The AUC explicitly directs readers to eFiling for a complete list of regulatory documents, so absence from a public website listing does not establish that a document does not exist.
How soon does the AUC publish a decision?
The AUC says its written decision is generally issued within 90 days after the hearing closes or the record closes. That period starts at the end of the evidentiary process, not when an application is filed.
Does the featured listing include every application?
No. The AUC describes it as highlighting a few projects and applications; its current-applications listing separately covers registered applications under review.
Can published hearing dates change?
Yes. The AUC warns that both the dates and duration of listed events may change, so a previously published hearing schedule is not a fixed commitment.
Start using AUC featured projects in Cursor
One Spiral account for every tool your agent needs. No subscription; you pay per run.
Paste this into Cursor:
set up https://spiral.ai/SKILL.md


