How to Use AUC regulatory documents in Devin
Returns issued-document listings with applicants, issue dates, proceeding numbers, and document links where available. Use it to locate a notice, approval, or decision before reading its text.
Prompts to try with AUC regulatory documents in Devin
Copy an example into Devin, or ask in your own words.
Use AUC regulatory documents to find issued records for proceeding 30450 and build a dated document table in our project.
Use AUC regulatory documents to look this up and give me the result as a table. Save the result in ./assets.
Pull the latest numbers from AUC regulatory documents and tell me what changed since last week.
Check AUC regulatory documents and summarize what you find in three bullet points.
Pull the newest data from AUC regulatory documents and give me the result as a table.
How to set up AUC regulatory documents in Devin
Pick the way that suits you. Each takes about two minutes.
Use Spiral's MCP server
- Add a custom MCP
Open Customize › MCPs. Click + and choose New MCP. Fill in:
- Sign in to Spiral and approve
In Customize › MCPs, open Spiral and choose Connect. Spiral opens: sign in, pick the organization and click Authorize. No API key.
- Check it
On Spiral's configuration page, click Test tools. Devin lists Spiral's tools.
Use the Spiral skill
- Send Devin this message
Your agent reads Spiral's skill and sets itself up.
set up https://spiral.ai/SKILL.md
- Sign in or paste a key
Approve Spiral in the browser, or give the agent a key from the console.
Use the Spiral CLI
- Install and sign in
Installs the Spiral CLI, signs you in and adds its skill to your coding agents.
npx -y spiral-cli@latest init
Call the Spiral API
- Create an API key
In the console, under API keys.
- Run AUC regulatory documents
One request; the result comes back by polling or a webhook.
curl https://api.spiral.ai/v1/runs \ -H "Authorization: Bearer $SPIRAL_API_KEY" \ -H "Content-Type: application/json" \ -H "Idempotency-Key: $(uuidgen)" \ -d '{ "provider": "alexandria", "model": "auc-ab-ca/regulatory-decision/list_documents", "input": { "sort": "newest" } }'
Then paste one of the prompts above: Devin finds AUC regulatory documents on Spiral, shows the price and runs it.
AUC regulatory documents providers and prices
Spiral runs AUC regulatory documents through Alexandria. Open a card for today's price, with every fee included.
Settings you can ask for
Ask Devin for any of these in your prompt.
| Setting | Allowed values | Default | Description |
|---|---|---|---|
| Sort | newest or oldest | newest | Table order: newest first (the site's default) or oldest first. |
| Limit | 1 to 1000 | 100 | Rows to return (matching rows when a filter is set). |
| Dataset | decisions, recent_updates, notices, facility_approvals, gas_pipeline_licences, monthly_energy_charges, or monthly_gas_charges | decisions | Which regulatory documents table to read. |
Every API field of Alberta Utilities Commission · List documents is on its tool page: open its card above.
What can you do with AUC regulatory documents in Devin?
Build an Alberta utility proceeding view in your project. Use the AUC's public record to add regulatory context and link each summary to its source.
Build a project timeline
Research the Collisard Power Station Project from its public overview through active applications, issued documents, and hearing entries. Connect the available milestones by proceeding number and explain what each document establishes.
Prepare a municipal development briefing
Assemble an AUC briefing on proposed energy facilities around Red Deer County. Use featured summaries to explain projects, active applications to identify ongoing reviews, and documents and calendar entries to establish regulatory milestones.
Compare featured energy proposals
Compare the projects selected for the AUC's featured listing. Read their overviews, check related active applications and issued documents, and identify any published hearings before explaining differences in their regulatory progress.
Produce an Alberta energy news briefing
Prepare a public-interest briefing that connects featured project announcements, applications under review, newly issued regulatory documents, and scheduled hearings. Read the underlying notices and decisions before describing outcomes.
Create a regulatory document library
Find AUC notices and decisions for an applicant such as AltaLink. Organize the records by proceeding and issue date, then attach summaries of the actual document text.
Prepare for a project hearing
Connect a scheduled AUC hearing to its proceeding, project overview, active applications, and issued notices. Read the public documents to explain the proposal and the participation information they contain.
Explain approval conditions
Locate a project's issued decision and read its conditions alongside the featured project overview. Explain how the regulator's disposition relates to the proposed facilities, using the decision as the evidence for each condition.
More on AUC regulatory documents and Devin
Overview
AUC regulatory documents in other agents
Questions about AUC regulatory documents in Devin
Can Devin use AUC regulatory documents?
Yes. Add Spiral to Devin as an MCP server, and Devin can find and run AUC regulatory documents like any built-in tool.
How much does AUC regulatory documents cost in Devin?
$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Devin plan is separate.
Do I need an Alexandria account to use AUC regulatory documents in Devin?
No. Spiral runs AUC regulatory documents on its own Alexandria account. You sign in to Spiral once and never paste a key.
How long does it take to set up AUC regulatory documents in Devin?
About two minutes: add a custom MCP, then sign in to Spiral and approve, then check it.
Does Devin wait while AUC regulatory documents runs?
AUC regulatory documents runs in the background. Devin starts the run, checks on it and gives you the json when it's ready.
What geographic and utility coverage does the AUC provide?
The AUC covers Alberta's utility regulatory matters. Its jurisdiction includes investor-owned electric, gas, and water utilities and certain municipally owned electric utilities.
Is the public website the complete regulatory record?
No. The AUC explicitly directs readers to eFiling for a complete list of regulatory documents, so absence from a public website listing does not establish that a document does not exist.
How soon does the AUC publish a decision?
The AUC says its written decision is generally issued within 90 days after the hearing closes or the record closes. That period starts at the end of the evidentiary process, not when an application is filed.
Does the featured listing include every application?
No. The AUC describes it as highlighting a few projects and applications; its current-applications listing separately covers registered applications under review.
Can published hearing dates change?
Yes. The AUC warns that both the dates and duration of listed events may change, so a previously published hearing schedule is not a fixed commitment.
Start using AUC regulatory documents in Devin
One Spiral account for every tool your agent needs. No subscription; you pay per run.
Paste this into Devin:
set up https://spiral.ai/SKILL.md


