Spiral gives your agent every tool with one account. Browse the tools →

Muse Code · Listings

How to Use Cambridge building permit details in Muse Code

Returns every published column for one Cambridge permit, including construction or equipment details where available. Use it to examine a specific project's scope after finding its permit.

Prompts to try with Cambridge building permit details in Muse Code

Copy an example into Muse Code, or ask in your own words.

Use Cambridge building permit details to inspect a returned permit at 111 First St and build a record view showing its published construction details.

Cambridge building permit detailsMuse Code
Try asking
  • Use Cambridge building permit details to look this up and give me the result as a table. Save the result in ./assets.

  • Pull the latest numbers from Cambridge building permit details and tell me what changed since last week.

  • Check Cambridge building permit details and summarize what you find in three bullet points.

  • Pull the newest data from Cambridge building permit details and give me the result as a table.

How to set up Cambridge building permit details in Muse Code

Pick the way that suits you. Each takes about two minutes.

Use Spiral's MCP server

  1. Install Muse Code
    curl -fsSL https://dev.meta.ai/install.sh | bash
  2. Ask Muse to add the server

    Start muse and ask:

    Add the Spiral MCP server at https://api.spiral.ai/mcp
  3. Sign in

    In your terminal, run:

    muse mcp login spiral

Use the Spiral skill

  1. Send Muse Code this message

    Your agent reads Spiral's skill and sets itself up.

    set up https://spiral.ai/SKILL.md
  2. Sign in or paste a key

    Approve Spiral in the browser, or give the agent a key from the console.

Use the Spiral CLI

  1. Install and sign in

    Installs the Spiral CLI, signs you in and adds its skill to your coding agents.

    npx -y spiral-cli@latest init

Call the Spiral API

  1. Create an API key

    In the console, under API keys.

  2. Run Cambridge building permit details

    One request; the result comes back by polling or a webhook.

    curl https://api.spiral.ai/v1/runs \
      -H "Authorization: Bearer $SPIRAL_API_KEY" \
      -H "Content-Type: application/json" \
      -H "Idempotency-Key: $(uuidgen)" \
      -d '{
        "provider": "alexandria",
        "model": "data-cambridgema-gov/building-permits/get_permit",
        "input": {
          "permit_number": "<permit_number>"
        }
      }'

Then paste one of the prompts above: Muse Code finds Cambridge building permit details on Spiral, shows the price and runs it.

Cambridge building permit details providers and prices

Spiral runs Cambridge building permit details through Alexandria. Open a card for today's price, with every fee included.

AlexandriaListings
City of Cambridge, MA permits (data.cambridgema.gov) · Get permit
data-cambridgema-gov/building-permits/get_permit

Settings you can ask for

Ask Muse Code for any of these in your prompt.

SettingAllowed valuesDefaultDescription
Categorynew_construction, alteration, short_form, roof, siding, solar, electrical, mechanical and 1 more

The permit's category, from the record. Omit to look in the five building permit datasets only; solar, electrical, mechanical and plumbing permits need it.

Every API field of City of Cambridge, MA permits (data.cambridgema.gov) · Get permit is on its tool page: open its card above.

What can you do with Cambridge building permit details in Muse Code?

Build a Cambridge construction dashboard backed by published city permits. Add contractor comparisons and project evidence to help users investigate local building activity.

Research solar installation firms

Rank firms by Cambridge solar permit activity, find their recorded projects, and examine available system details before building a business shortlist.

Study heat pump permitting

Compare contractor activity in electrical and mechanical permits, investigate matching jobs, and inspect equipment details for an electrification market report.

Plan a roofing supplier's territory

Identify firms with recorded Cambridge roofing activity, examine their project locations, and review individual permits to inform business outreach.

Compare commercial renovation activity

Use contractor totals to identify active firms, search their alteration permits, and review commercial project records for a local construction brief.

Review a commercial property's permitted work

Find permits at a Cambridge commercial address and inspect the published records to assemble a documented renovation history.

Prepare a public facility project brief

Collect permits at a city facility and read the individual records to summarize the permitted construction and trade work.

Questions about Cambridge building permit details in Muse Code

Can Muse Code use Cambridge building permit details?

Yes. Add Spiral to Muse Code as an MCP server, and Muse Code can find and run Cambridge building permit details like any built-in tool.

How much does Cambridge building permit details cost in Muse Code?

$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Muse Code plan is separate.

Do I need an Alexandria account to use Cambridge building permit details in Muse Code?

No. Spiral runs Cambridge building permit details on its own Alexandria account. You sign in to Spiral once and never paste a key.

How long does it take to set up Cambridge building permit details in Muse Code?

About two minutes: install Muse Code, then ask Muse to add the server, then sign in.

Does Muse Code wait while Cambridge building permit details runs?

Cambridge building permit details runs in the background. Muse Code starts the run, checks on it and gives you the json when it's ready.

Which area and permit types does the data cover?

It covers Cambridge, Massachusetts, through nine city datasets for building work, roofing, siding, solar, electrical, mechanical, and plumbing permits.

How often does the permit data refresh?

The provider describes daily reloads from Cambridge's permitting system. This is a daily publication cycle rather than a continuous feed.

Does this cover every kind of Cambridge permit?

These endpoints cover nine construction and trade datasets. The city's broader Permit Finder includes more than 30 permit types, including demolition and party tents.

Does an issued building permit prove construction has started?

Cambridge requires the building permit before work begins. Its issue date therefore cannot establish the actual date work started.

Can I reuse Cambridge permit data commercially?

The permit data is published under the PDDL, which permits commercial reuse and combining covered data with other datasets. Cambridge provides its open data without warranty.

Get started

Start using Cambridge building permit details in Muse Code

One Spiral account for every tool your agent needs. No subscription; you pay per run.

Paste this into Muse Code:

Set up Muse Code

set up https://spiral.ai/SKILL.md
Are you an AI agent? See setup options