Spiral gives your agent every tool with one account. Browse the tools →

Notion · Industry Data

How to Use CER pipeline tolls in Notion

Returns transportation toll records for major Canadian oil and natural gas pipelines. Use it to compare benchmark routes and toll history; CER charts cover selected paths, so a full route review requires the tariff filing.

Prompts to try with CER pipeline tolls in Notion

Copy an example into Notion, or ask in your own words.

Every month, use CER pipeline tolls to check for changes in the published NGTL firm receipt toll records and summarize any new effective periods.

CER pipeline tollsNotion
Try asking
  • Every Monday at 9am: use CER pipeline tolls to look this up and give me the result as a table.

  • Pull the latest numbers from CER pipeline tolls and tell me what changed since last week.

  • Check CER pipeline tolls and summarize what you find in three bullet points.

  • Pull the newest data from CER pipeline tolls and give me the result as a table.

How to set up CER pipeline tolls in Notion

Pick the way that suits you. Each takes about two minutes.

Use the Spiral skill

  1. Send Notion this message

    Your agent reads Spiral's skill and sets itself up.

    set up https://spiral.ai/SKILL.md
  2. Sign in or paste a key

    Approve Spiral in the browser, or give the agent a key from the console.

Use Spiral's MCP server

  1. Allow custom MCP servers

    A workspace owner opens Settings › Connections, then the Manage tab, and turns on Enable custom MCP servers. Where members may install only approved connections, also add Spiral under Approved connections › Add approved connection › Custom MCP server with the URL below.

  2. Add Spiral to a custom agent

    Open the custom agent (or create one), then Settings › Tools & Access › Add connection › Custom MCP server. Paste this URL, name it Spiral, keep OAuth and click Connect.

    https://api.spiral.ai/mcp
  3. Sign in to Spiral and approve

    Spiral opens: sign in, pick the organization and click Authorize. No API key. Spiral gives the connection its own key; Notion never sees it, and you can remove it under Settings › Connected apps in the console.

  4. Run CER pipeline tolls in a workflow step

    Give the step an instruction like the ones below and run it on your trigger or schedule. Spiral finds CER pipeline tolls, prices it and runs it each time the step fires.

Use the Spiral CLI

  1. Install and sign in

    Installs the Spiral CLI, signs you in and adds its skill to your coding agents.

    npx -y spiral-cli@latest init

Call the Spiral API

  1. Create an API key

    In the console, under API keys.

  2. Run CER pipeline tolls

    One request; the result comes back by polling or a webhook.

    curl https://api.spiral.ai/v1/runs \
      -H "Authorization: Bearer $SPIRAL_API_KEY" \
      -H "Content-Type: application/json" \
      -H "Idempotency-Key: $(uuidgen)" \
      -d '{
        "provider": "alexandria",
        "model": "cer-rec-gc-ca/energy-data/tolls",
        "input": {
          "pipeline": "<pipeline>"
        }
      }'

Then paste one of the prompts above: Notion finds CER pipeline tolls on Spiral, shows the price and runs it.

CER pipeline tolls providers and prices

Spiral runs CER pipeline tolls through Alexandria. Open a card for today's price, with every fee included.

AlexandriaIndustry Data

Settings you can ask for

Ask Notion for any of these in your prompt.

SettingAllowed valuesDefaultDescription
Limit1 to 20050

Rows per page.

Offseta number from 00

next_offset from the previous page; repeat the other inputs with it.

Current onlyon or off

Only tolls in force on the newest date in the file.

Every API field of Canada Energy Regulator (CER) open data · Tolls is on its tool page: open its card above.

What can you do with CER pipeline tolls in Notion?

Keep a Canadian energy research brief current as CER publishes revised observations or new records. Scheduled comparisons can highlight changes for a named commodity, province, or pipeline.

Western Canadian oil export review

Compare reported crude exports with production scenarios, then examine the profiles, throughput, and benchmark tolls of the pipelines serving those markets.

Natural gas transportation study

Put Canadian gas trade and production scenarios alongside NGTL or Westcoast system information, measured flows, capacity, and transportation toll history.

Trans Mountain oversight briefing

Prepare a pipeline briefing combining system context, throughput, benchmark tolls, reported incidents, and issued regulatory instruments. Keep each timeline separate so coincident events are not presented as proven causes.

Shipping route research

Review a pipeline’s system information, benchmark toll history, flow observations, and issued instruments before examining its complete tariff filings.

Quarterly Canadian energy research update

Refresh a research brief with trade observations, pipeline flows, toll records, incidents, and regulatory instruments. Revisit system profiles and energy scenarios when the source publishes changes.

Questions about CER pipeline tolls in Notion

Can Notion use CER pipeline tolls?

Yes. Add Spiral to Notion as an MCP server, and Notion can find and run CER pipeline tolls like any built-in tool.

How much does CER pipeline tolls cost in Notion?

$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Notion plan is separate.

Do I need an Alexandria account to use CER pipeline tolls in Notion?

No. Spiral runs CER pipeline tolls on its own Alexandria account. You sign in to Spiral once and never paste a key.

How long does it take to set up CER pipeline tolls in Notion?

About two minutes: allow custom MCP servers, then add Spiral to a custom agent, then sign in to Spiral and approve.

Does Notion wait while CER pipeline tolls runs?

CER pipeline tolls runs in the background. Notion starts the run, checks on it and gives you the json when it's ready.

Does CER pipeline data cover every pipeline in Canada?

CER regulates pipelines crossing provincial boundaries or the Canada-U.S. border. Its pipeline records therefore have a federal coverage boundary and should not be treated as a complete inventory of Canadian pipelines.

How often does CER update its pipeline flow information?

Pipeline Profiles schedule throughput updates quarterly, in March, May, August, and November. Daily natural gas observations describe the measurement frequency, so they do not imply daily publication.

Are Energy Future results predictions?

CER describes the results as scenarios for testing assumptions rather than forecasts or predictions. The 2026 edition contains four scenarios, so comparisons should identify which scenario produced each result.

What geographic coverage does Energy Future provide?

Energy Future scenarios cover every Canadian province and territory and all energy commodities. The 2026 outlook projects supply and demand through 2050.

Do CER toll charts include every shipping route?

CER displays major or benchmark toll paths for illustration. A review of all available paths requires the pipeline’s tariff filing.

Get started

Start using CER pipeline tolls in Notion

One Spiral account for every tool your agent needs. No subscription; you pay per run.

Paste this into Notion:

Set up Notion

set up https://spiral.ai/SKILL.md
Are you an AI agent? See setup options