Spiral gives your agent every tool with one account. Browse the tools →

Notion · Lead Gen

How to Use FCC test lab directory in Notion

Returns testing firms listed in the FCC equipment authorization system. Use it to research laboratories behind compliance testing; certification decisions belong to certification bodies.

Prompts to try with FCC test lab directory in Notion

Copy an example into Notion, or ask in your own words.

Monthly, use FCC test lab directory to look for Bay Area Compliance Laboratories and report changes in its returned records.

FCC test lab directoryNotion
Try asking
  • Every Monday at 9am: use FCC test lab directory to look this up and give me the result as a table.

  • Pull the latest numbers from FCC test lab directory and tell me what changed since last week.

  • Check FCC test lab directory and summarize what you find in three bullet points.

  • Pull the newest data from FCC test lab directory and give me the result as a table.

How to set up FCC test lab directory in Notion

Pick the way that suits you. Each takes about two minutes.

Use the Spiral skill

  1. Send Notion this message

    Your agent reads Spiral's skill and sets itself up.

    set up https://spiral.ai/SKILL.md
  2. Sign in or paste a key

    Approve Spiral in the browser, or give the agent a key from the console.

Use Spiral's MCP server

  1. Allow custom MCP servers

    A workspace owner opens Settings › Connections, then the Manage tab, and turns on Enable custom MCP servers. Where members may install only approved connections, also add Spiral under Approved connections › Add approved connection › Custom MCP server with the URL below.

  2. Add Spiral to a custom agent

    Open the custom agent (or create one), then Settings › Tools & Access › Add connection › Custom MCP server. Paste this URL, name it Spiral, keep OAuth and click Connect.

    https://api.spiral.ai/mcp
  3. Sign in to Spiral and approve

    Spiral opens: sign in, pick the organization and click Authorize. No API key. Spiral gives the connection its own key; Notion never sees it, and you can remove it under Settings › Connected apps in the console.

  4. Run FCC test lab directory in a workflow step

    Give the step an instruction like the ones below and run it on your trigger or schedule. Spiral finds FCC test lab directory, prices it and runs it each time the step fires.

Use the Spiral CLI

  1. Install and sign in

    Installs the Spiral CLI, signs you in and adds its skill to your coding agents.

    npx -y spiral-cli@latest init

Call the Spiral API

  1. Create an API key

    In the console, under API keys.

  2. Run FCC test lab directory

    One request; the result comes back by polling or a webhook.

    curl https://api.spiral.ai/v1/runs \
      -H "Authorization: Bearer $SPIRAL_API_KEY" \
      -H "Content-Type: application/json" \
      -H "Idempotency-Key: $(uuidgen)" \
      -d '{
        "provider": "alexandria",
        "model": "apps-fcc-gov/equipment-authorizations/list_test_firms",
        "input": {
          "city": "<city>"
        }
      }'

Then paste one of the prompts above: Notion finds FCC test lab directory on Spiral, shows the price and runs it.

FCC test lab directory providers and prices

Spiral runs FCC test lab directory through Alexandria. Open a card for today's price, with every fee included.

AlexandriaLead Gen
FCC OET Equipment Authorization System (apps.fcc.gov) · List test firms
apps-fcc-gov/equipment-authorizations/list_test_firms

Settings you can ask for

Ask Notion for any of these in your prompt.

SettingAllowed valuesDefaultDescription
Page size1 to 50025

Rows per page (the form's show_records; 500 accepted by the site).

Every API field of FCC OET Equipment Authorization System (apps.fcc.gov) · List test firms is on its tool page: open its card above.

What can you do with FCC test lab directory in Notion?

Maintain a recurring FCC research digest for manufacturers and certification organizations you follow. A scheduled agent can compare returned records over time and surface changes for review.

Build a hardware supplier review

Resolve a manufacturer's grantee records, find its device filings, and review grants and public exhibits. Check the certification bodies and testing firms involved to assemble a supplier evidence packet.

Prepare a wireless module review

Compare candidate manufacturers and module filings, then read grant conditions and available supporting documents. Research the listed certification and testing organizations before preparing questions for a compliance review.

Create a certification evidence register

Connect company records and FCC IDs to the relevant filings, grants, and public document lists. Add directory records for certification bodies and test firms so reviewers can trace the organizations behind the evidence.

Research certification service candidates

Start with certification-body and test-lab directories, then inspect public filings for manufacturers in the device category you care about. Use grants and exhibits to investigate documented work before shortlisting organizations for further review.

Questions about FCC test lab directory in Notion

Can Notion use FCC test lab directory?

Yes. Add Spiral to Notion as an MCP server, and Notion can find and run FCC test lab directory like any built-in tool.

How much does FCC test lab directory cost in Notion?

$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Notion plan is separate.

Do I need an Alexandria account to use FCC test lab directory in Notion?

No. Spiral runs FCC test lab directory on its own Alexandria account. You sign in to Spiral once and never paste a key.

How long does it take to set up FCC test lab directory in Notion?

About two minutes: allow custom MCP servers, then add Spiral to a custom agent, then sign in to Spiral and approve.

Does Notion wait while FCC test lab directory runs?

FCC test lab directory runs in the background. Notion starts the run, checks on it and gives you the json when it's ready.

Does the FCC database cover every electronic product?

No. EAS contains certification applications and grants, while equipment authorized through Supplier's Declaration of Conformity ordinarily requires no submission of compliance data to the FCC.

When does certification information become public?

Supporting information becomes public upon grant of the equipment authorization, subject to confidentiality restrictions. Pending requests are excluded from disclosure before the authorization takes effect.

Are all filing documents available to read?

Public documents can include test reports, photos, and manuals. Confidential exhibits can be withheld, so the public record may not expose every document submitted for certification.

How is an FCC ID structured?

It combines a three-character or five-character grantee code with a product code of up to 14 characters. The product code can include a hyphen, which should be preserved.

What is the difference between a test lab and a certification body?

Test laboratories produce compliance testing evidence. Telecommunications certification bodies evaluate application data and test reports and make certification decisions.

Get started

Start using FCC test lab directory in Notion

One Spiral account for every tool your agent needs. No subscription; you pay per run.

Paste this into Notion:

Set up Notion

set up https://spiral.ai/SKILL.md
Are you an AI agent? See setup options