Spiral gives your agent every tool with one account. Browse the tools →

Perplexity · Listings

How to Use DC building permit details in Perplexity

Returns one DC permit's published record, including its address, status, issue date, and work description. Use it to inspect a known permit or check the details behind a search result.

Prompts to try with DC building permit details in Perplexity

Copy an example into Perplexity, or ask in your own words.

Use DC building permit details to explain the permit already selected for 50 Massachusetts Avenue NE, Washington, DC, including its status, issue date, and work description.

DC building permit detailsPerplexity
Try asking
  • Use DC building permit details to summarize the permit selected for 801 Mount Vernon Place NW, Washington, DC, and quote its work description if one is available.

  • Use DC building permit details to look this up and give me the result as a table.

  • Pull the latest numbers from DC building permit details and tell me what changed since last week.

  • Check DC building permit details and summarize what you find in three bullet points.

How to set up DC building permit details in Perplexity

Pick the way that suits you. Each takes about two minutes.

Use the Perplexity connector

  1. Add a remote connector

    In Perplexity, open Plugins in the sidebar (or Customize › Connectors if you don't see Plugins yet). Choose Add custom › Add MCP connector, then Remote. Name it Spiral and paste this MCP server URL:

    https://api.spiral.ai/mcp
  2. Sign in to Spiral and approve

    Select the Spiral card on the Plugins page to start sign-in. Spiral opens: sign in, pick the organization and click Authorize. No API key.

Use the Spiral skill

  1. Send Perplexity this message

    Your agent reads Spiral's skill and sets itself up.

    set up https://spiral.ai/SKILL.md
  2. Sign in or paste a key

    Approve Spiral in the browser, or give the agent a key from the console.

Use the Spiral CLI

  1. Install and sign in

    Installs the Spiral CLI, signs you in and adds its skill to your coding agents.

    npx -y spiral-cli@latest init

Call the Spiral API

  1. Create an API key

    In the console, under API keys.

  2. Run DC building permit details

    One request; the result comes back by polling or a webhook.

    curl https://api.spiral.ai/v1/runs \
      -H "Authorization: Bearer $SPIRAL_API_KEY" \
      -H "Content-Type: application/json" \
      -H "Idempotency-Key: $(uuidgen)" \
      -d '{
        "provider": "alexandria",
        "model": "opendata-dc-gov/building-permits/get_permit",
        "input": {
          "permit_number": "<permit_number>"
        }
      }'

Then paste one of the prompts above: Perplexity finds DC building permit details on Spiral, shows the price and runs it.

DC building permit details providers and prices

Spiral runs DC building permit details through Alexandria. Open a card for today's price, with every fee included.

AlexandriaListings
Washington, DC Building Permits (opendata.dc.gov) · Get permit
opendata-dc-gov/building-permits/get_permit

What can you do with DC building permit details in Perplexity?

Turn DC permit records into an address-specific renovation brief with dates, statuses, and descriptions of work. A chat app can explain the published records in plain English and compare permits without assuming that a date alone establishes project status.

Commercial property permit review

Find permits for a commercial address, then inspect the relevant records to build a dated account of alterations and their published statuses.

Public facility renovation brief

Gather permit records for a library, school, or recreation center and examine the work descriptions for a concise renovation brief.

Construction activity report

Compare matching permit records by issue month and work type, then inspect individual permits to explain notable projects.

Commercial site watch

Check for recently issued permits at selected business properties and review the underlying records before preparing an activity alert.

Permit status comparison

Collect records for a commercial project and compare their published statuses over time, checking individual permits when a difference appears.

Reporting on neighborhood development

Find construction and alteration permits in a DC area, then inspect selected records to support reporting with permit numbers, dates, addresses, and work descriptions.

Questions about DC building permit details in Perplexity

Can Perplexity use DC building permit details?

Yes. Add Spiral to Perplexity as an MCP server, and Perplexity can find and run DC building permit details like any built-in tool.

How much does DC building permit details cost in Perplexity?

$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Perplexity plan is separate.

Do I need an Alexandria account to use DC building permit details in Perplexity?

No. Spiral runs DC building permit details on its own Alexandria account. You sign in to Spiral once and never paste a key.

How long does it take to set up DC building permit details in Perplexity?

About two minutes: add a remote connector, then sign in to Spiral and approve.

Does Perplexity wait while DC building permit details runs?

DC building permit details runs in the background. Perplexity starts the run, checks on it and gives you the json when it's ready.

What area does the permit data cover?

It covers building construction and alteration permits from the District of Columbia Department of Buildings. It is a DC source, so it does not provide a regional permit history for neighboring Maryland or Virginia jurisdictions.

How far back does DC publish permit data?

DC's source service lists annual permit layers spanning 2009 through 2026. That establishes the published year range, not a guarantee that every historical permit is present.

How often is the source updated?

DC's building-permit metadata specifies daily updates. That is a publication schedule, not a promise that a permit appears immediately after an agency action.

Does a modified date mean the permit changed?

The metadata defines LASTMODIFIEDDATE as the date of a successful transfer from DOB. Compare the published status and work description before describing a refreshed record as a changed permit.

Can I rely on every permit's map location?

No. DC warns that failed address matches can produce 0,0 coordinates, which require manual geocoding before they can support location analysis.

Get started

Start using DC building permit details in Perplexity

One Spiral account for every tool your agent needs. No subscription; you pay per run.

Paste this into Perplexity:

Set up Perplexity

set up https://spiral.ai/SKILL.md
Are you an AI agent? See setup options