Canada Energy Regulator (CER) open data · Energy future
cer-rec-gc-ca/energy-data/energy_futureGet industry and reference data with Canada Energy Regulator (CER) open data · Energy future from Alexandria through one Spiral API key. Questions like "CER 2026 projection of Alberta in situ bitumen output in 2035", "Brent price assumption in the Canada Net-zero scenario", "electricity generation by fuel in Ontario to 2050". It runs in the background and returns structured JSON. Pay as you go, with no subscription.
Pricing
$0.00873 per call.
Limits
- Runs
- In the background
- Returns
- json
- Longest queue wait
- 1 hour
- Run deadline
- 5 minutes
- Longest run, end to end
- 225 minutes
- Largest inline input
- 1 MB
- Largest input file
- 2 GB
- Largest output
- 5 GB
Input
| Field | Kind | Default | Description |
|---|---|---|---|
dataset required | one of benchmark_prices, butane, crude_oil_production, electricity_capacity, electricity_capacity_technology, electricity_generation, electricity_generation_technology, electricity_interchange, end_use_demand, end_use_prices, ethane, greenhouse_gas_emissions, hydrogen_production, macro_indicators, natural_gas_drilling, natural_gas_production, pentanes_plus, primary_demand, propane | — | Dataset (2021 lacks the two technology views and greenhouse gas emissions). |
limit | number 1 to 1000 | 200 | Rows per page. |
offset | number 0 to … | 0 |
|
region | text | — | Province, territory or |
edition | number 2016 to 2100 | 2026 | Energy Future edition: 2026 (default), 2023 or 2021. |
year_to | number 1990 to 2100 | — | year_to |
category | text | — | Sector ( |
scenario | text | — | Scenario name or part of it ( |
variable | text | — | Variable or part of it ( |
year_from | number 1990 to 2100 | — | year_from |
Same request in code
curl https://api.spiral.ai/v1/runs \
-H "Authorization: Bearer $SPIRAL_API_KEY" \
-H "Content-Type: application/json" \
-H "Idempotency-Key: $(uuidgen)" \
-d '{
"provider": "alexandria",
"model": "cer-rec-gc-ca/energy-data/energy_future",
"input": {
"dataset": "benchmark_prices"
}
}'Frequently asked questions
How much does Canada Energy Regulator (CER) open data · Energy future cost?
$0.00873 per call. You pay as you go from one Spiral balance, with no subscription, and a failed run is not charged.
How do I use Canada Energy Regulator (CER) open data · Energy future through an API?
Send `POST /v1/runs` with `"provider": "alexandria"`, `"model": "cer-rec-gc-ca/energy-data/energy_future"` and the input fields on this page, using one Spiral API key. It runs in the background: poll the run, or name a webhook to be told when it finishes.
Do I need an account with Alexandria to use Canada Energy Regulator (CER) open data · Energy future?
No. Spiral runs it on its own Alexandria account and charges your Spiral balance.
Can my AI agent use Canada Energy Regulator (CER) open data · Energy future?
Yes. Agents find and run it through Spiral's MCP server, CLI or agent skill, with the same API key.