Spiral gives your agent every tool with one account. Browse the tools →

AlexandriaListingsAvailable now

Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity

data-ct-gov/building-permits/contractor_activity

Search property, job and marketplace listings with Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity from Alexandria through one Spiral API key. Market share of solar or battery installers in Connecticut, or in one town or ZIP, for a period; find the most active installers before listing their installs with search_installations. It runs in the background and returns structured JSON. Pay as you go, with no subscription.

Pricing

$0.00873 per call.

Limits

Runs
In the background
Returns
json
Longest queue wait
1 hour
Run deadline
5 minutes
Longest run, end to end
225 minutes
Largest inline input
1 MB
Largest input file
2 GB
Largest output
5 GB

Input

FieldKindDefaultDescription
ziptext—

Five-digit ZIP of the install, e.g. 06033. Pattern: ^[0-9]{5}$.

basisone of
completed, enrolled, energized
completed

Which date counts an install and bounds the window: completed (default), enrolled (ESS application submitted, RSIP approval) or energized (ESS only, battery in service).

limitnumber
1 to 100
25

Rows per page.

sincetext—

First day of the window, inclusive, YYYY-MM-DD. Omit for all time. Pattern: ^[0-9]{4}-[0-9]{2}-[0-9]{2}$.

untiltext—

Last day of the window, inclusive, YYYY-MM-DD. Pattern: ^[0-9]{4}-[0-9]{2}-[0-9]{2}$.

cursortext—

next_cursor from the previous page; repeat the same filters with it. Pattern: ^[0-9]+$.

sectorone of
residential, commercial
—

residential, or commercial for ESS C&I projects. RSIP is residential only.

programone of
ess, rsip
ess

ess (default): Energy Storage Solutions battery projects, 2022 to now, including projects in progress. rsip: the closed Residential Solar Investment Program, rooftop solar approved 2004-2021 and completed through February 2024.

rank_byone of
installs, kw
installs

installs: most projects first; kw: most total kW first (solar kW for rsip, battery kW for ess).

municipalitytext—

Connecticut town, exact and case-insensitive (Glastonbury, West Hartford). For RSIP the postal village also matches (Mystic, Niantic).

pre_existingtrue or false—

ESS only: true keeps batteries that were already installed when they enrolled (installers that enroll after energizing, ConnectedSolutions transfers); false keeps systems installed under the program. Omit for both.

Same request in code

curl https://api.spiral.ai/v1/runs \
  -H "Authorization: Bearer $SPIRAL_API_KEY" \
  -H "Content-Type: application/json" \
  -H "Idempotency-Key: $(uuidgen)" \
  -d '{
    "provider": "alexandria",
    "model": "data-ct-gov/building-permits/contractor_activity",
    "input": {
      "zip": "<zip>"
    }
  }'

Frequently asked questions

How much does Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity cost?

$0.00873 per call. You pay as you go from one Spiral balance, with no subscription, and a failed run is not charged.

How do I use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity through an API?

Send `POST /v1/runs` with `"provider": "alexandria"`, `"model": "data-ct-gov/building-permits/contractor_activity"` and the input fields on this page, using one Spiral API key. It runs in the background: poll the run, or name a webhook to be told when it finishes.

Do I need an account with Alexandria to use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity?

No. Spiral runs it on its own Alexandria account and charges your Spiral balance.

Can my AI agent use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity?

Yes. Agents find and run it through Spiral's MCP server, CLI or agent skill, with the same API key.