Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity
data-ct-gov/building-permits/contractor_activitySearch property, job and marketplace listings with Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity from Alexandria through one Spiral API key. Market share of solar or battery installers in Connecticut, or in one town or ZIP, for a period; find the most active installers before listing their installs with search_installations. It runs in the background and returns structured JSON. Pay as you go, with no subscription.
Pricing
$0.00873 per call.
Limits
- Runs
- In the background
- Returns
- json
- Longest queue wait
- 1 hour
- Run deadline
- 5 minutes
- Longest run, end to end
- 225 minutes
- Largest inline input
- 1 MB
- Largest input file
- 2 GB
- Largest output
- 5 GB
Input
| Field | Kind | Default | Description |
|---|---|---|---|
zip | text | — | Five-digit ZIP of the install, e.g. 06033. Pattern: ^[0-9]{5}$. |
basis | one of completed, enrolled, energized | completed | Which date counts an install and bounds the window: completed (default), enrolled (ESS application submitted, RSIP approval) or energized (ESS only, battery in service). |
limit | number 1 to 100 | 25 | Rows per page. |
since | text | — | First day of the window, inclusive, YYYY-MM-DD. Omit for all time. Pattern: ^[0-9]{4}-[0-9]{2}-[0-9]{2}$. |
until | text | — | Last day of the window, inclusive, YYYY-MM-DD. Pattern: ^[0-9]{4}-[0-9]{2}-[0-9]{2}$. |
cursor | text | — | next_cursor from the previous page; repeat the same filters with it. Pattern: ^[0-9]+$. |
sector | one of residential, commercial | — | residential, or commercial for ESS C&I projects. RSIP is residential only. |
program | one of ess, rsip | ess | ess (default): Energy Storage Solutions battery projects, 2022 to now, including projects in progress. rsip: the closed Residential Solar Investment Program, rooftop solar approved 2004-2021 and completed through February 2024. |
rank_by | one of installs, kw | installs | installs: most projects first; kw: most total kW first (solar kW for rsip, battery kW for ess). |
municipality | text | — | Connecticut town, exact and case-insensitive (Glastonbury, West Hartford). For RSIP the postal village also matches (Mystic, Niantic). |
pre_existing | true or false | — | ESS only: true keeps batteries that were already installed when they enrolled (installers that enroll after energizing, ConnectedSolutions transfers); false keeps systems installed under the program. Omit for both. |
Same request in code
curl https://api.spiral.ai/v1/runs \
-H "Authorization: Bearer $SPIRAL_API_KEY" \
-H "Content-Type: application/json" \
-H "Idempotency-Key: $(uuidgen)" \
-d '{
"provider": "alexandria",
"model": "data-ct-gov/building-permits/contractor_activity",
"input": {
"zip": "<zip>"
}
}'Frequently asked questions
How much does Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity cost?
$0.00873 per call. You pay as you go from one Spiral balance, with no subscription, and a failed run is not charged.
How do I use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity through an API?
Send `POST /v1/runs` with `"provider": "alexandria"`, `"model": "data-ct-gov/building-permits/contractor_activity"` and the input fields on this page, using one Spiral API key. It runs in the background: poll the run, or name a webhook to be told when it finishes.
Do I need an account with Alexandria to use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity?
No. Spiral runs it on its own Alexandria account and charges your Spiral balance.
Can my AI agent use Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity?
Yes. Agents find and run it through Spiral's MCP server, CLI or agent skill, with the same API key.