How to Use CER energy projections in Google Antigravity
Returns modeled Canadian energy supply and demand under Energy Future scenarios, including provincial production and electricity generation. Use it to compare possible outcomes through 2050 against reported activity.
Prompts to try with CER energy projections in Google Antigravity
Copy an example into Google Antigravity, or ask in your own words.
Use CER energy projections to build a chart in this project comparing Alberta crude oil production from 2030 through 2050 across the available 2026 scenarios.
Use CER energy projections to look this up and give me the result as a table. Save the result in ./assets.
Pull the latest numbers from CER energy projections and tell me what changed since last week.
Check CER energy projections and summarize what you find in three bullet points.
Pull the newest data from CER energy projections and give me the result as a table.
How to set up CER energy projections in Google Antigravity
Pick the way that suits you. Each takes about two minutes.
Use Spiral's MCP server
- Open the MCP config
* Antigravity App: click Customizations, then Installed. In the MCP Servers section, click Copy Config File Path and open that file. * Antigravity IDE: click … at the top of the agent side panel, select MCP Servers, then Manage MCP Servers › View raw config. * Antigravity CLI: edit ~/.gemini/config/mcp_config.json.
- Add the server
Add Spiral under mcpServers:
{ "mcpServers": { "spiral": { "serverUrl": "https://api.spiral.ai/mcp" } } } - Sign in
In the Antigravity App, open Customizations › Installed. Under MCP Servers, click Authenticate next to Spiral. Sign in to Spiral, pick the organization and click Authorize. Copy the authorization code the browser shows, paste it into Enter authorization code and click Submit. No API key.
Use the Spiral skill
- Send Google Antigravity this message
Your agent reads Spiral's skill and sets itself up.
set up https://spiral.ai/SKILL.md
- Sign in or paste a key
Approve Spiral in the browser, or give the agent a key from the console.
Use the Spiral CLI
- Install and sign in
Installs the Spiral CLI, signs you in and adds its skill to your coding agents.
npx -y spiral-cli@latest init
Call the Spiral API
- Create an API key
In the console, under API keys.
- Run CER energy projections
One request; the result comes back by polling or a webhook.
curl https://api.spiral.ai/v1/runs \ -H "Authorization: Bearer $SPIRAL_API_KEY" \ -H "Content-Type: application/json" \ -H "Idempotency-Key: $(uuidgen)" \ -d '{ "provider": "alexandria", "model": "cer-rec-gc-ca/energy-data/energy_future", "input": { "dataset": "benchmark_prices" } }'
Then paste one of the prompts above: Google Antigravity finds CER energy projections on Spiral, shows the price and runs it.
CER energy projections providers and prices
Spiral runs CER energy projections through Alexandria. Open a card for today's price, with every fee included.
Settings you can ask for
Ask Google Antigravity for any of these in your prompt.
| Setting | Allowed values | Default | Description |
|---|---|---|---|
| Dataset | benchmark_prices, butane, crude_oil_production, electricity_capacity, electricity_capacity_technology, electricity_generation, electricity_generation_technology, electricity_interchange and 11 more | Dataset (2021 lacks the two technology views and greenhouse gas emissions). | |
| Limit | 1 to 1000 | 200 | Rows per page. |
| Offset | a number from 0 | 0 |
|
| Edition | 2016 to 2100 | 2026 | Energy Future edition: 2026 (default), 2023 or 2021. |
| Year to | 1990 to 2100 | year_to | |
| Year from | 1990 to 2100 | year_from |
Every API field of Canada Energy Regulator (CER) open data · Energy future is on its tool page: open its card above.
What can you do with CER energy projections in Google Antigravity?
Build a Canadian energy research view that brings CER observations, scenarios, or regulatory records into your project. Add comparisons for named provinces or pipeline systems while preserving the source’s units and dates.
Western Canadian oil export review
Compare reported crude exports with production scenarios, then examine the profiles, throughput, and benchmark tolls of the pipelines serving those markets.
Natural gas transportation study
Put Canadian gas trade and production scenarios alongside NGTL or Westcoast system information, measured flows, capacity, and transportation toll history.
Energy outlook evidence pack
Build a Canadian energy outlook with scenario comparisons and reported trade, accompanied by incident and regulatory timelines for the infrastructure discussed.
LNG supply and infrastructure study
Compare natural gas production scenarios and reported LNG exports with gas pipeline profiles, throughput, and relevant regulatory instruments.
Quarterly Canadian energy research update
Refresh a research brief with trade observations, pipeline flows, toll records, incidents, and regulatory instruments. Revisit system profiles and energy scenarios when the source publishes changes.
More on CER energy projections and Google Antigravity
CER energy projections in other agents
Questions about CER energy projections in Google Antigravity
Can Google Antigravity use CER energy projections?
Yes. Add Spiral to Google Antigravity as an MCP server, and Google Antigravity can find and run CER energy projections like any built-in tool.
How much does CER energy projections cost in Google Antigravity?
$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Google Antigravity plan is separate.
Do I need an Alexandria account to use CER energy projections in Google Antigravity?
No. Spiral runs CER energy projections on its own Alexandria account. You sign in to Spiral once and never paste a key.
How long does it take to set up CER energy projections in Google Antigravity?
About two minutes: open the MCP config, then add the server, then sign in.
Does Google Antigravity wait while CER energy projections runs?
CER energy projections runs in the background. Google Antigravity starts the run, checks on it and gives you the json when it's ready.
Does CER pipeline data cover every pipeline in Canada?
CER regulates pipelines crossing provincial boundaries or the Canada-U.S. border. Its pipeline records therefore have a federal coverage boundary and should not be treated as a complete inventory of Canadian pipelines.
How often does CER update its pipeline flow information?
Pipeline Profiles schedule throughput updates quarterly, in March, May, August, and November. Daily natural gas observations describe the measurement frequency, so they do not imply daily publication.
Are Energy Future results predictions?
CER describes the results as scenarios for testing assumptions rather than forecasts or predictions. The 2026 edition contains four scenarios, so comparisons should identify which scenario produced each result.
What geographic coverage does Energy Future provide?
Energy Future scenarios cover every Canadian province and territory and all energy commodities. The 2026 outlook projects supply and demand through 2050.
Do CER toll charts include every shipping route?
CER displays major or benchmark toll paths for illustration. A review of all available paths requires the pipeline’s tariff filing.
Start using CER energy projections in Google Antigravity
One Spiral account for every tool your agent needs. No subscription; you pay per run.
Paste this into Google Antigravity:
set up https://spiral.ai/SKILL.md


