How to Use Connecticut solar and battery installer activity in Google Antigravity
Returns contractor rankings by project count or total kW from Connecticut Green Bank solar and battery program records. Use it to compare installers across a town or reporting period.
Prompts to try with Connecticut solar and battery installer activity in Google Antigravity
Copy an example into Google Antigravity, or ask in your own words.
Use Connecticut solar and battery installer activity to compare ESS contractors by completed project count in 2025, then add the results to my project's reporting table.
Use Connecticut solar and battery installer activity to compare RSIP contractors in Bridgeport by total kW and build a chart in my project.
Use Connecticut solar and battery installer activity to compare commercial ESS contractors by total kW and project count, then render both measures in my dashboard.
Use Connecticut solar and battery installer activity to look this up and give me the result as a table. Save the result in ./assets.
Pull the latest numbers from Connecticut solar and battery installer activity and tell me what changed since last week.
How to set up Connecticut solar and battery installer activity in Google Antigravity
Pick the way that suits you. Each takes about two minutes.
Use Spiral's MCP server
- Open the MCP config
* Antigravity App: click Customizations, then Installed. In the MCP Servers section, click Copy Config File Path and open that file. * Antigravity IDE: click … at the top of the agent side panel, select MCP Servers, then Manage MCP Servers › View raw config. * Antigravity CLI: edit ~/.gemini/config/mcp_config.json.
- Add the server
Add Spiral under mcpServers:
{ "mcpServers": { "spiral": { "serverUrl": "https://api.spiral.ai/mcp" } } } - Sign in
In the Antigravity App, open Customizations › Installed. Under MCP Servers, click Authenticate next to Spiral. Sign in to Spiral, pick the organization and click Authorize. Copy the authorization code the browser shows, paste it into Enter authorization code and click Submit. No API key.
Use the Spiral skill
- Send Google Antigravity this message
Your agent reads Spiral's skill and sets itself up.
set up https://spiral.ai/SKILL.md
- Sign in or paste a key
Approve Spiral in the browser, or give the agent a key from the console.
Use the Spiral CLI
- Install and sign in
Installs the Spiral CLI, signs you in and adds its skill to your coding agents.
npx -y spiral-cli@latest init
Call the Spiral API
- Create an API key
In the console, under API keys.
- Run Connecticut solar and battery installer activity
One request; the result comes back by polling or a webhook.
curl https://api.spiral.ai/v1/runs \ -H "Authorization: Bearer $SPIRAL_API_KEY" \ -H "Content-Type: application/json" \ -H "Idempotency-Key: $(uuidgen)" \ -d '{ "provider": "alexandria", "model": "data-ct-gov/building-permits/contractor_activity", "input": { "zip": "<zip>" } }'
Then paste one of the prompts above: Google Antigravity finds Connecticut solar and battery installer activity on Spiral, shows the price and runs it.
Connecticut solar and battery installer activity providers and prices
Spiral runs Connecticut solar and battery installer activity through Alexandria. Open a card for today's price, with every fee included.
$0.00873 per call.
Settings you can ask for
Ask Google Antigravity for any of these in your prompt.
| Setting | Allowed values | Default | Description |
|---|---|---|---|
| Basis | completed, enrolled, or energized | completed | Which date counts an install and bounds the window: completed (default), enrolled (ESS application submitted, RSIP approval) or energized (ESS only, battery in service). |
| Limit | 1 to 100 | 25 | Rows per page. |
| Sector | residential or commercial | residential, or commercial for ESS C&I projects. RSIP is residential only. | |
| Program | ess or rsip | ess | ess (default): Energy Storage Solutions battery projects, 2022 to now, including projects in progress. rsip: the closed Residential Solar Investment Program, rooftop solar approved 2004-2021 and completed through February 2024. |
| Rank by | installs or kw | installs | installs: most projects first; kw: most total kW first (solar kW for rsip, battery kW for ess). |
| Pre existing | on or off | ESS only: true keeps batteries that were already installed when they enrolled (installers that enroll after energizing, ConnectedSolutions transfers); false keeps systems installed under the program. Omit for both. |
Every API field of Connecticut Solar and Battery Installs (data.ct.gov) · Contractor activity is on its tool page: open its card above.
What can you do with Connecticut solar and battery installer activity in Google Antigravity?
Build a town comparison or installer table from Connecticut Green Bank program records. A coding agent can add project counts, system sizes, and ESS status summaries to your project's reports.
Build a local installer shortlist
Compare contractors active in Glastonbury using program project counts, then review installation records to understand their system sizes and local work.
Compare project volume with installed power
Identify contractors leading by project count versus total kW. Review individual installations to see whether a few large systems explain the difference.
Compare town installation patterns
Compare program activity in West Hartford and Glastonbury, including installer concentration and system sizes, to inform a municipal energy briefing.
Document historical solar deployment
Use RSIP records to describe which contractors delivered solar projects in Bridgeport and the sizes of those systems. Keep conclusions within RSIP coverage.
Review battery program progress
Compare installer activity across reporting periods and inspect ESS project statuses to distinguish completed work from projects still moving through the program.
Research commercial battery contractors
Compare contractors associated with commercial ESS projects and review the underlying system sizes to prepare questions for a contractor assessment.
More on Connecticut solar and battery installer activity and Google Antigravity
Connecticut solar and battery installer activity in other agents
Questions about Connecticut solar and battery installer activity in Google Antigravity
Can Google Antigravity use Connecticut solar and battery installer activity?
Yes. Add Spiral to Google Antigravity as an MCP server, and Google Antigravity can find and run Connecticut solar and battery installer activity like any built-in tool.
How much does Connecticut solar and battery installer activity cost in Google Antigravity?
$0.00873 per call. You pay from your Spiral balance as you go, with no subscription, and a failed run is not charged. Your Google Antigravity plan is separate.
Do I need an Alexandria account to use Connecticut solar and battery installer activity in Google Antigravity?
No. Spiral runs Connecticut solar and battery installer activity on its own Alexandria account. You sign in to Spiral once and never paste a key.
How long does it take to set up Connecticut solar and battery installer activity in Google Antigravity?
About two minutes: open the MCP config, then add the server, then sign in.
Does Google Antigravity wait while Connecticut solar and battery installer activity runs?
Connecticut solar and battery installer activity runs in the background. Google Antigravity starts the run, checks on it and gives you the json when it's ready.
Does this cover every solar or battery installation in Connecticut?
Coverage is limited to projects supported by ESS or RSIP. A comparison using these records measures activity within those incentive programs, rather than the entire Connecticut installation market.
How fresh is the battery project data?
The provider says ESS data reloads monthly. It includes projects moving from application through completion, so a refresh can change existing project records as well as add projects.
What does the solar dataset cover?
RSIP publishes anonymized records of approved and completed projects supported by the Residential Solar Investment Program. Connecticut Green Bank identifies system sizes, costs, and installing contractors among the available details.
Does an approved battery project mean the battery is installed?
ESS separates Submitted, Approved, and Completed statuses. Use completed projects when measuring delivered installations; approval alone does not establish completion.
Are these customer identification records?
Both ESS and RSIP describe their public project listings as anonymized. They support analysis of program participation and contractor activity rather than customer identification.
Start using Connecticut solar and battery installer activity in Google Antigravity
One Spiral account for every tool your agent needs. No subscription; you pay per run.
Paste this into Google Antigravity:
set up https://spiral.ai/SKILL.md


